毛片免费视频,亚洲AV无码国产精品色午友在线,中文字幕乱码中文乱码777 ,日本熟妇浓毛hdsex

產(chǎn)品分類PRODUCT

我們相信好的產(chǎn)品是信譽(yù)的保證!

咨詢熱線:

021-58378307,601

技術(shù)文章/ ARTICLE

我的位置:首頁(yè)  >  技術(shù)文章  >  Simple installation steps

Simple installation steps

更新時(shí)間:2017-12-25      瀏覽次數(shù):1171

Simple installation steps

  1. Check all goods against list. Pay attention to the steel-seal letter 1 1223344 on the surface of the scale-bodies,load cells,iron cases(See the following figure).Be ready to install.

1                  2 

3                     4

1                  2

3↑                     4

 

Lift the scale-bodies of corresponding marking with the 28MM shackle and assemble with a crane(usually 15T),overturn and lie them flat(pad wood under the scale bodies to prevent the paint scalling off),the marking of 1↓2↓ with the marking of 1↑2↑ of the scale body,the marking of 3 4with the marking of 3↑4↑of the scale-body,each should be tighten the scale-bodies with 105 sets of M20×60 socket head cap bolts with M30 adjustable spanner.M20 socket head cap spanner andφSimple installation steps

版權(quán)所有©2024 上海偵權(quán)衡器有限公司 All Rights Reserved   備案號(hào):滬ICP備14040776號(hào)-1   sitemap.xml
技術(shù)支持:化工儀器網(wǎng)   管理登陸

掃碼關(guān)注我們

TEL:15216829778

掃碼添加微信